Earth Tech Materials Impact Report IMP-SYS / 2026

Results
that
transform
construction.

We're not just talking about innovation — we're delivering results. Each project generates savings, reduces emissions, and transforms waste into real value across every site we touch.

Start a project
IMP-SYS / Field Report REV-01 · 2026
Projects
7 Delivered Industrial · Commercial · Mixed-use
CO₂ Avoided
+7,100 Tons Across all executed projects
Markets
3 Cities Chihuahua · Monterrey · San Pedro
10+ Clients implementing
our solutions
Plastic Transformed — +1,250 Tons Formwork Installed — +17,800 Tons Monterrey, MX · Est. 2024
1,250+
Tonnes of plastic transformed
into construction materials
7,100+
Tonnes of CO₂ avoided
across executed projects
17,800+
Tonnes of formwork
installed to date
47,000+
Tonnes of water saved
in construction processes
10+
Companies integrating
WAS solutions today
3
Cities with delivered
projects in Mexico
01 — Impact at Scale
Not just talking about
innovation — delivering results.
Cumulative Impact Record Earth Tech Materials · Operations 2024–2026 · IMP-REC-01
Projects 07
Cities 03
Year 2026
+1,250 T

Tonnes of plastic waste converted into high-performance construction materials — keeping material out of landfill and into the built environment.

IMP-MAT / PLASTIC-REC
+7,100 T

Tonnes of CO₂ emissions avoided across all executed projects — a direct result of replacing carbon-intensive conventional materials with WAS solutions.

IMP-ENV / CO2-AVOID
+17,800 T

Tonnes of reusable Polycrete formwork deployed across industrial, commercial, and residential construction sites in northern Mexico.

IMP-OPS / FWK-INST
+47,000 T

Tonnes of water saved in construction processes through the use of WAS materials, which require significantly less water than conventional formwork systems.

IMP-ENV / H2O-SAVE
10+

Companies and project owners that already integrate WAS solutions into their construction operations and supply chains.

IMP-BIZ / CLIENTS-ACT
3 Cities

Delivered projects operating across Chihuahua, Monterrey and San Pedro Garza García — establishing a proven track record across diverse construction environments.

IMP-GEO / MX-REG-03
+20% Strength

In certain applications, EcoClinker can increase mechanical performance compared to traditional materials.

IMP-REF / 07
No PM2.5 / PM10

During production, EcoClinker avoids particulate emissions associated with conventional clinker.

IMP-REF / 08
−20 kg CO₂/m²

Compared to traditional wood systems, Cimbras reduce CO₂ emissions per installed square metre.

IMP-REF / 09
−100%

As a reusable alternative, Cimbras replace disposable panels traditionally used in construction.

IMP-REF / 10
Low

In humid and on-site conditions, Cimbras maintain dimensional stability across multiple reuse cycles.

IMP-REF / 11
Up to 80°C

Designed for demanding construction conditions, Cimbras withstand high operating temperatures.

IMP-REF / 12

Waste transformed
into value.

02 — Project Benefits

Every project
delivers on all
four fronts.

WAS solutions don't force a trade-off between sustainability and performance. Each project simultaneously reduces cost, accelerates schedule, cuts waste, and lowers operating expenses — not one or the other.

BEN-01 −30% Cost savings by use

Compared to wooden and phenolic formwork, WAS Polycrete systems deliver a direct cost reduction per square metre deployed.

BEN-02 −60 days Works completed ahead of schedule

Industrial and commercial projects using WAS systems are consistently completed up to 60 days earlier than originally planned timelines.

BEN-03 −40% Less construction waste

Replacing disposable materials with reusable WAS systems reduces on-site construction waste by 40% across the project lifecycle.

BEN-04 −20% Lower operating expenses

Up to 20% reduction in operating expenses thanks to fewer replacements, reduced logistics complexity, and lower material handling requirements.

03 — Success Stories

Projects
that prove
the model.

Four delivered projects across different construction typologies and scales — each demonstrating WAS solutions working in real conditions, with real results, for real clients.

Talk to our team →
Industrial unit in northern Mexico — Polycrete formwork installation Industrial

Industrial unit
in northern Mexico

Formwork installed
14,400 m² Polycrete
CO₂ reduction
−40% vs conventional
Outcome
Reduced logistics times
Industrial plant in Monterrey — sustainable construction formwork Industrial

Industrial plant
in Monterrey

Formwork used
1,788 m²
Standards
Sustainable construction
Schedule
60 days ahead of plan
Shopping center in metropolitan area — WAS formwork solutions Commercial

Shopping center
in metropolitan area

Formwork installed
432 m²
Waste reduction
Significant vs traditional
Location
Monterrey metro area
Skyscraper in Monterrey — Solar Impulse Foundation recognized project Vertical

Skyscraper
in Monterrey

Formwork installed
596 m²
Recognition
Solar Impulse Foundation
Location
Monterrey, NL
Ready to generate impact?

Integrate our solutions.
Measure the difference.

Talk to our team and find out how to integrate WAS sustainable solutions into your next project or process — and start delivering results from day one.

Get in touch
Designer session Dark backgrounds Accent