We're not just talking about innovation — we're delivering results. Each project generates savings, reduces emissions, and transforms waste into real value across every site we touch.
Start a projectNot just talking about
innovation — delivering results.
Tonnes of plastic waste converted into high-performance construction materials — keeping material out of landfill and into the built environment.
IMP-MAT / PLASTIC-RECTonnes of CO₂ emissions avoided across all executed projects — a direct result of replacing carbon-intensive conventional materials with WAS solutions.
IMP-ENV / CO2-AVOIDTonnes of reusable Polycrete formwork deployed across industrial, commercial, and residential construction sites in northern Mexico.
IMP-OPS / FWK-INSTTonnes of water saved in construction processes through the use of WAS materials, which require significantly less water than conventional formwork systems.
IMP-ENV / H2O-SAVECompanies and project owners that already integrate WAS solutions into their construction operations and supply chains.
IMP-BIZ / CLIENTS-ACTDelivered projects operating across Chihuahua, Monterrey and San Pedro Garza García — establishing a proven track record across diverse construction environments.
IMP-GEO / MX-REG-03In certain applications, EcoClinker can increase mechanical performance compared to traditional materials.
IMP-REF / 07During production, EcoClinker avoids particulate emissions associated with conventional clinker.
IMP-REF / 08Compared to traditional wood systems, Cimbras reduce CO₂ emissions per installed square metre.
IMP-REF / 09As a reusable alternative, Cimbras replace disposable panels traditionally used in construction.
IMP-REF / 10In humid and on-site conditions, Cimbras maintain dimensional stability across multiple reuse cycles.
IMP-REF / 11Designed for demanding construction conditions, Cimbras withstand high operating temperatures.
IMP-REF / 12Waste transformed
into value.
WAS solutions don't force a trade-off between sustainability and performance. Each project simultaneously reduces cost, accelerates schedule, cuts waste, and lowers operating expenses — not one or the other.
Compared to wooden and phenolic formwork, WAS Polycrete systems deliver a direct cost reduction per square metre deployed.
Industrial and commercial projects using WAS systems are consistently completed up to 60 days earlier than originally planned timelines.
Replacing disposable materials with reusable WAS systems reduces on-site construction waste by 40% across the project lifecycle.
Up to 20% reduction in operating expenses thanks to fewer replacements, reduced logistics complexity, and lower material handling requirements.
Four delivered projects across different construction typologies and scales — each demonstrating WAS solutions working in real conditions, with real results, for real clients.
Talk to our team →
Industrial
Industrial
Commercial
Vertical
Talk to our team and find out how to integrate WAS sustainable solutions into your next project or process — and start delivering results from day one.
Get in touch